Photographer

Construction has begun on Phase 1 of an eight phase major road construction project affecting Air Depot Boulevard south of Reserve Road through Patrol Road (east of the Hill Conference Center) on the south side of Tinker Air Force Base. Until Oct. 2, Patrol Road — from west of Gott Gate to the Hill Conference Center — is closed to all traffic. Signs are posted directing traffic to appropriate detour routes. The primary detour route will be Reserve Road and Rapcon Road through the 507th Air Refueling Wing area. Phase 2, beginning approximately Oct. 2, will close Gott Gate. Truck Gate operations will continue during all phases of this project. Drivers should plan alternate routes, including different gates, during these construction periods. Access to the 72nd Medical Group facility is not affected in Phase 1 of this project. Base officials will provide updates as the contractor moves through the phases of this project. Direct questions to Base Civil Engineering at 734-3451. (Air Force photo by Kelly White)

PHOTO BY: Kelly White
VIRIN: 160905-F-RI777-001.JPG
FULL SIZE: 1.9 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.